On the Threshold

On the Threshold

Film On the Threshold

The chief engineer proposes to make changes to the design of the polar hydroelectric power station by abandoning the construction of the tunnel due to a collapse.
To download, you must be logged in and purchase a subscription.

1-Month Subscription

107 thousand Toman ۲۰٪ discount
89 thousand Toman
30 day

2-Month Subscription

215 thousand Toman ۲۰٪ discount
179 thousand Toman
60 day

1-Year Subscription

1,187 thousand Toman ۲۰٪ discount
989 thousand Toman
360 day